Fieldbus Inc.

Industrial signals,translated.

Gateways, boards and protocol stacks for HART, WirelessHART, FOUNDATION Fieldbus and PROFIBUS.

Explore products
(01) What we do

We make field instruments speak the language of the plant. As gateways on the DIN rail, boards inside the device, or protocol stacks for your own design.

(02) Portfolio

All 21 products
(03) Product finder15 gateways & boards

Find the right
product.

Three questions. No catalog to dig through.

1 — I have a
2 — and need to connect it to
3 — mounted as

Pick what you have and where it needs to go. We'll show the products that do exactly that.

Developing your own field device? See protocol stacks and starter kits
(04) In focusDIN rail gateway
T310 Modbus RTU and Modbus TCP to HART converter T310 · 3D
Fig. 01 — T310Move your pointer to tilt
Modbus RTU / TCP → HART
T310

Any Modbus instrument, as a native HART transmitter.

A three-wire DIN rail module that reads the Modbus device and presents it on the HART loop: primary variable with status, plus seven dynamic variables.

Mounting
DIN rail, three-wire
Input
Modbus RTU (RS485) or Modbus TCP
Output
HART with active current source
Variables
PV with status, plus 7 dynamic variables
Diagnostics
NAMUR NE107 status, NE43 alarm current
Power
24 V instrument power
Setup
SW02 PC tool, or pre-configured at the factory
(05) TechnologiesView all 21 products

Four standards.
One supplier.

Every product is built around the communication standards that run process plants worldwide.

(06) ServicesAll services

From first spec
to the field.

Engineering support since 1996, for instrument makers, system integrators and plant operators.

01

Device development

Upgrade an existing product or develop a new field device with FOUNDATION Fieldbus, HART or WirelessHART, on time and on budget.

  • Communication stacks, integration and porting
  • Standard and custom function blocks
  • Device Description (DD) development
  • Hardware and software components
02

Testing and compliance

Get through registration the first time, with experienced help on test preparation and execution.

  • HART and FF compliance testing
  • FF interoperability (ITK) pre-testing
  • Device testing and registration
  • Control system compatibility testing
03

Consulting and training

Plan, specify and troubleshoot fieldbus systems, and train the people who run them.

  • Implementation planning and system specification
  • Evaluation of vendor proposals
  • Installation assessment and troubleshooting
  • Engineering and maintenance training
(Start a project)
Let's talk →

Tell us about your instrument and network. We'll recommend the right board, gateway or stack and send a quote.